Phase 1: Structure and collaboration

Optical clock metrology, relativistic theory, atmospheric science and geodetic analysis work together to develop time as a new tie in space geodesy.

The research unit is designed as a multidisciplinary collaboration. Half of the projects sit at the boundary of its main research themes. The others provide the prerequisites or exploit the resulting observations and models. The Geodetic Observatory Wettzell (GOW) provides the common experimental setting, connected to Potsdam and PTB in Braunschweig through the planned clock-comparison chain.

The central idea is to link geodetic instruments to a common coherent time reference. Delay-compensated time and frequency distribution and closure measurements reveal variable instrumental delays. Optical clock comparisons add gravity-potential information, creating a path towards reference systems that connect geometry and physical heights.

Why it matters

How can ten specialised projects deliver one consistent measurement and analysis chain?

Improved clocks alone cannot resolve all errors in geodetic observations. Calibration, time transfer, relativistic interpretation, atmospheric modelling and joint analysis must be developed together so that one project's measurements can become another project's reliable input.

How the projects interact

Realise clocks and links (P1, P2, P3). P3 develops the SOC2 optical reference. P1 connects the GNSS measurement chain to the timing infrastructure. P2 develops remote clock comparisons through ACES and the PTB-Potsdam fibre link.

Provide the physical models (P4, P8). P4 supplies the relativistic description of clock comparisons and synchronisation. P8 provides atmospheric measurements and propagation models used to interpret the observations.

Check the measurement chains (P7). P7 designs and analyses common-target closure experiments, working with the instrumental projects to identify residual biases and refine calibration.

Extract geodetic information (P5, P6, P9, P10). P5 derives physical heights, P6 exploits stable clocks in GNSS, P9 studies clock-based reference-frame combination, and P10 combines clock and atmospheric information at the observation level.

These interfaces require feedback in both directions. Closure residuals guide improvements to instruments and calibration. Atmospheric and relativistic models support the experiments. Analysis and simulation reveal which clock and link properties matter for geodetic products. Shared observations, annual status seminars and regular exchanges connect the projects.

Six shared objectives

  • O1: A common tie through time. Connect the space-geodetic techniques through one coherent time scale.
  • O2: Reliable and stable reference frames. Identify and control time-variable systematic errors and ties.
  • O3: An integrated reference frame. Demonstrate a connection between geometric observations and physical-height differences.
  • O4: A relativistic description. Describe coherent time consistently on the rotating Earth.
  • O5: Gravitational-redshift tests. Use ground optical clocks and ACES for tests of general relativity.
  • O6: Better atmospheric corrections. Separate propagation delays from instrumental effects.

Ten key tasks

Task Work Participating projects
T1 Establish a common, consistent tie between the major space-geodetic techniques at Wettzell through time coherence. P1, P2, P3, P4, P5, P6, P7, P8, P9, P10
T2 Develop and validate closure measurements for VLBI, SLR and GNSS: the clock ties. P1, P2, P5, P6, P7, P9, P10
T3 Evaluate the long-term stability of clock ties within and across Wettzell's measurement systems. P1, P2, P3, P5, P6, P7, P8, P9, P10
T4 Introduce accurate optical clocks into space geodesy and include them in the clock ties. P1, P2, P3, P4, P5, P6, P9
T5 Combine geometric and physical quantities to determine a physical-height difference in a first test environment. P2, P3, P4, P5, P8, P9
T6 Derive a relativistic model of global time coherence, including Earth rotation. P3, P4, P5
T7 Extend time coherence to another observatory with access to an optical clock, directly or through a fibre link. P1, P2, P3, P4, P5, P6, P7, P8, P9, P10
T8 Explore the limits of global time coherence and test gravitational redshift through common-view and non-common-view ACES comparisons. P2, P3, P4, P5, P8
T9 Separate atmospheric propagation delays from instrumental systematic errors and improve the analysis models. P1, P2, P6, P7, P8, P9, P10
T10 Combine space-geodetic techniques at the observation level on the available testbed. P1, P2, P5, P6, P7, P8, P9, P10

What Phase 1 brings together

  • Coherent timing infrastructure and calibration concepts for connecting GNSS, SLR and VLBI at Wettzell.
  • Optical-clock characterisation, relativistic models and methods for clock-based physical-height determination.
  • Clock modelling and integrated analysis that test how timing information improves geodetic products and expose remaining instrumental and atmospheric effects.

Together, the ten projects establish the experimental and analytical foundations for extending coherent time from an observatory testbed to a network of observatories.

Project Information